Saturday, September 19, 2009

Another Day in Paradise

Things are going pretty well at the dairy near Harlan. We have 3.5 miles of hose laid out to a 120 acre field. Through good use of our hose humper over terraces and waterways we shouldn't have to make any additional hose sets and we're applying at 1450 GPM.  Feeding our applicator is a Redi-Prime® pump trailer at the site running at about 3/4 throttle with an additional 3 jump pumps all running on the conserative side under 180 psi of pressure because we're crossing 2 streams and passing through 2 culverts.  We have about 200 feet of vertical elevation change. Doing good...Ben

No comments:

Post a Comment